Charterhouse Street

Blou Dynamic continued the healthy working relationship with Coniston on the redevelopment of a Grade 2 listed building in the heart of Clerkenwell, London. Along with typical 1st and 2nd fix carpentry and joinery works, the scope comprised of:

  • Design, manufacture and installation of fire rated internal and external doorsets with feature vision panels and AOVs

  • Timber casement and box sliding sash windows

  • Timber winding staircases including balustrading and handrails

  • Feature 3-metre high external entrance doorset, designed in-house exactly in accordance with an existing door on a different elevation, manufactured in solid hardwood.

Location 89 Charterhouse Street, London

Client Norfolk International

Architect Giles Quarme and Associates

Structural Engineer N/A

Contractor Coniston

Previous
Previous

Royal United Services Institute

Next
Next

Selfridges