Royal United Services Institute (RUSI)

The transformation of this Grade II* Listed Building on London’s Whitehall firstly saw Blou Dynamic carry out a structural carpentry scope to form a new storey, works comprised of Posi joists and standard timber joists to form new floors and an insulated timber mansard roof construction with numerous dormers, Velux roof lights and a secret gutter detail.

Upon completion of the structural carpentry scope, Blou Dynamic commenced the 2nd fix carpentry and joinery scope comprising of the following:

  • Design, manufacture and installation of fire rated flush and panelled doors, either primed or veneered, with vision panels. Doors designed to match existing.

  • Refurbishment of existing panelled doors, panelling and general joinery such as cabinetry and shelving.

  • Heritage style solid Brass ironmongery to new and existing refurbished doors.

  • Timber heritage style panelling to various locations.

  • French-Polishing to new doors and existing doors, panelling, cabinetry and shelving.

  • Hi-Deck 28 Acoustic flooring to new storey.

  • Various 2nd fixing carpentry items such as solid timber skirtings, architraves, plinth blocks and window boards.

Photography by MSMR Architects

Location 61 Whitehall

Client Royal United Services Institute

Architect MSMR & Campbell Architects

Structural Engineer Elliot Wood Partnership

Contractor Coniston

Previous
Previous

Eccleston Place

Next
Next

Charterhouse Street